Shoreham Energy 80 MW Simple Cycle Peaking Project

​CLIENT: PENNSYLVANIA POWER & LIGHT

LOCATION: SHOREHAM, NEW YORK

IN-SERVICE DATE: JULY 2002

SCOPE: GENERAL CONTRACTOR

Phoenix was selected to construct this simple cycle power plant. The project was constructed simultaneously along with the Edgewood Energy Project. Both were started in February of 2002 and placed in commercial operation in July of 2002.

 

Major equipment installation for these sites included:

 

  • Two liquid fuel fired LM‐6000 PC Sprint GE Turbine Generators

  • Selective Catalytic Reduction (SCR) units on each

  • One Generator Step Up (GSU) transformer at each location

  • Gas Compression Equipment (Edgewood)

 

Additional work included construction of the mechanical, electrical. service and water injection buildings and a diked oil tank farm, as well as a 42‐foot‐high sound wall.

 

Electricity generated by the new plant is purchased by the Long Island Power Authority to serve the need for additional electrical demand on Long Island.

 

The project was constructed on a fast‐track basis (built as it was being designed) with a very aggressive schedule. Communication, teamwork and timely dissemination of information to the field was essential for the success of this project.

Please reload

Corporate Headquarters                   Phoenix Tulsa Office                               Phoenix North Constructors

650 From Road | Suite 255                     18 S. Lewis Avenue                                     715 5th Avenue SW | Suite 2920 

Paramus, NJ 07652                                Tulsa, OK 74104                                          Calgary, AB T2P 2X6                                                                                                                 

© Content copyright 2017 Phoenix Power Group, Inc. All rights reserved.

  • LinkedIn - Black Circle
  • Facebook - Black Circle
bottom of page