top of page

Three Creeks 690 MW Power Project

CLIENT: KINETICOR RESOURCES GROUP

LOCATION: PEACE RIVER, ALBERTA, CANADA

IN‐SERVICE DATE: 2022

STATUS: PRE-CONSTRUCTION

SCOPE: EPC CONTRACTOR

​Phoenix is the EPC Contractor for a 690 MW combined cycle facility in Peace River, Alberta. The facility will consist of multiple combustion gas turbines, HRSG’s, a Steam Turbine, and an Air-Cooled Condenser operating in a combined cycle configuration. The facility was originally designed as a cogeneration facility providing steam injection and utilities for a cancelled project. Phoenix will be completing the installation of the facility and converting to combined cycle operation.

The plant will be electricity interconnected with the Alberta electric grid and provide a significant source of base load power generation for Alberta. 

Please reload

Corporate Headquarters                   Phoenix Tulsa Office                               Phoenix North Constructors

650 From Road | Suite 255                     18 S. Lewis Avenue                                     715 5th Avenue SW | Suite 2920 

Paramus, NJ 07652                                Tulsa, OK 74104                                          Calgary, AB T2P 2X6                                                                                                                 

© Content copyright 2017 Phoenix Power Group, Inc. All rights reserved.

  • LinkedIn - Black Circle
  • Facebook - Black Circle
bottom of page