Bridgewater 15 MW Wood Fired Power Plant

​CLIENT: BRIDGEWATER ELECTRIC

LOCATION: BRIDGEWATER, NEW HAMPSHIRE

IN-SERVICE DATE: JUNE 1986

SCOPE: EPC CONTRACTOR

 

EPC Contractor for a $25 Million, 18 MW Wood Fired Power Plant. Project Equipment included:

 

• Detroit Stoker Grate

• 160,000#/HR Foster Wheeler Boiler

• GE Condensing Steam Turbine

• Fuel Storage Silos and Open Fuel Storage Yard

• Fuel Handling & Conveying Systems

• Spray Cooling Pond

• Gravel Bed Air Pollution Control System

• Fisher Pro‐Log Control System

• 13.8kV – 34.5kV Step‐Up Transformer

• Utility Interconnect (metering & Relay Protection)

 

The project has been in continuous operation since June of 1986 with an availability of over 95%. 